Skip to content

New lawn program

New seed has no roots, and new turf only a few centimetres, so the surface has to stay moist. The New lawn method waters light and often at first, then longer and less often as roots grow down, until the lawn is ready for normal watering.

  • It runs in stages from a start date. Each stage sets how many days it lasts, how often it waters (several goes a day, daily, or every few days) and how many mm each go puts down.
  • The mm become minutes at each zone’s watering rate, so it suits each zone’s sprinklers.
  • The start date picks the stages:
    • Starting October to March: the warm-season stages.
    • Starting April to September: the gentler cool-season stages.
  • While it runs, its zones sit out their other programs. When the last stage ends, it switches itself off and those zones go back to normal.
  • Rain settings still apply.
  1. Open the Watering tab and tap + New program.
  2. Pick New lawn.
  3. Under What’s new?, choose:
    • From seed (or oversown);
    • Instant turf; or
    • After renovating (scarify, core, topdress).
  4. Under Which zones?, tick the new lawn’s zones.
  5. Tap Suggest settings.
  6. In the editor, check the start date (it suggests today) and the start times. The table shows each stage.
  7. Tap Save.

Up to three goes a day are used in the early stages. They default to early morning, mid-morning and evening, away from the hottest, windiest part of the day. Move them if your water authority’s hours need it. See Watering rules.

  • Lay turf, then start. Set the start date to the day it goes down, and water it in straight away with a manual run.
  • If you’re oversowing, pick From seed. The renovation option is a short taper for a lawn that wasn’t seeded.
  • Measure the watering rate. A catch-cup test makes each go’s minutes accurate. On a new lawn, too little can lose the lot.
  • The sources the stages follow are listed under the method’s (i).

Groundsman · smart watering and lawn care for Adelaide homes ·hello@groundsman.au